Computer Science and Application MP Set Exam 2022 Q-101 to 110

 101. Requirements which specify the constraints imposed on the software are called :

(A) Domain requirements

(B) Functional requirements

(C) Non-functional requirements

(D) None of the above

Answer : (C) 

102. Exchange of data between two modules in a structure chart is shown by :

(A) Data couple

(B) Flag

(C) Condition

(D) None of the above

Answer : (A) 

103. If P is risk probability, L is loss, then Risk Exposure (RE) is computed as :

(A) RE = P/L

(B) RE = P * L

(C) RE = P + L

(D) RE = P * L/2

Answer : (B) 

104. Cost of software mainjejiance-is very high. A large amount of software life cycle costs is expanded, in the maintenance activities. The maximum effort spent on which of the following maintenance activities ?

(A) Preventive maintenance

(B) Corrective maintenance

(C) Adaptive maintenance

(D) Perfective maintenance

Answer : (D) 

105. All activities which are on critical i«th have slack time equal to :

(A) 0

(B) 1

(C) 2

(D) None of the above

Answer : (A) 

106. Which of the following architectures is characteristized by a series of transformations on orderly defined set of input data ? .

(A) Data centered architecture

(B) Data flow architecture

(C) layer architecture

(D) Call and return architecture

Answer : (B) 

107. If a program has two integer inputs on a machine with a 32-bit word, then how many, possible test cases does ;this program have ?

(A) 216 

(B) 232

(C) 264

(D) 2128

Answer : (C) 

108. Which of the following is a calculated value of programmer effort/COCOMO effort for an organic project under the category of application program with estimated size of 10 K Line of Code (LOC) ?

(A) 13.0

(B) 26.9

(C) 41.2

(D) 55.8

Answer : (B) 

109. In basic COCOMO model, effort for, embedded system is given by :

(A) 2.4 * (KLOC)1.05

(B) 3.0 * (KLOC)1.120

(C) 3.6 * (KLOC)1.20

(D) None of the above

Answer : (C) 

110. If the software had 5 failures in 100 tests during 10 days of testing, what would be a good estimate of the reliability of the software over the next day (assume 10 test per day, average from last 10 days) ?

(A) 0.05

(B) 0.027

(C) 0.005

(D) 0.598

Answer : (D) 